Introduction

This course is for candidates to develop the practical skills and knowledge to:

 

Materials

Candidates are required to provide the necessary materials for all cable jointing courses.

Alternatively we can provide materials for customers at an extra cost.

  • Content
  • Aim
  • Participants
  • Certification
  • Materials

Content

The candidate will:

• Understand and demonstrate personal safety including the basics of on-site safety requirements, hand tools, resins and personal hygiene
• Understand the basic principles and the use of test instruments including earth loop, megger and test lamps and evaluate results.
• Demonstrate test procedures for resistance, continuity, earth loop and polarity
• Understand visual cable identification (cable depths, markers, tiles)
• Demonstrate live working procedures and when they are required
• Understand when they can work on damaged/faulty apparatus
• Demonstrate they can strip cables
• Fit joint boxes
• Mix and pour the resin
• Demonstrate they can complete a single-phase cut out including jointing instructions and procedures
• Demonstrate they can complete a single-phase sub-service pot end
• Demonstrate they can complete a single-phase sub-service straight joint including jointing instructions and procedures
• Demonstrate they can complete a three-phase sub-service straight joint including jointing instructions and procedures
• Demonstrate they can make cable ends safe
• Demonstrate they can complete a single-phase service joint on to three-phase Wavecon mains
• Demonstrate they can complete a three-phase service joint on to three-phase Wavecon mains
• Demonstrate they can complete service pot ends, single and three-phase

Aim

At the end of this course delegates will be able to demonstrate:

  • An ability to complete LV joints live
  • The use of safety equipment
  • Identification of electrical cables

At the end of this course delegates will understand:

  • Safe working techniques
  • Live Working Techniques
  • The correct use of tools and equipment

Participants

Individuals or clients nominated persons who are required to work on live Low Voltage cable systems

Certification

Candidates will be issued with a Certificate of Attendance and Report to provide evidence towards competency

Materials Required

Jointers Low Voltage Cable Jointing Single and Three Phase Service and Sub Service Jointing  Course Material Requirements
The list below is for jointing material and cable required
   
Quantity Per Practice Description
   
The candidate / sponsor can determine cable size and therefore joint size of the list below
Where the material is provided by candidate / sponsor. We recommend 185mm Wavecon Mains Cable 
   
2 3C WAVECON SERVICE for single phase supply
   
3 3C WAVECON SERVICE for three phase supply (requires a 3 of phase connectors)
2 3C WAVECON, 1 PH MAINS SERVICE, 3PH STOP END
 Do not forget Resin for one wavecon joint only
   
3 Single Phase Sub-Service Straight Joint
3 Single Phase Sub-Service Pot Ends
3 Three Phase Sub-Service Straight Joint
2 Three Phase Sub-Service Pot Ends
   
   
14m 3c wavecon
10m 25mm single phase cne
12m 25mm three phase cne 
   
   
Sundries Materials for cable preparation Supplied by SES Training Solutions
Quantity Per Practice Description
n/a Range of Colours for electrical phase tapes
n/a Large tie wraps 1 Bag
n/a JT400 SOLVENT WIPES DISPENSER (TUB 400) 
n/a P60 Emery / Garnet Roll
n/a Single phase cut out cne
n/a Three phase cut out termination cne
   

Download Course Details

Click here to download these course details.